Below is information for any necessary permits.
In order to view and download the forms, Adobe Acrobat Reade must be installed on the computer. Download a free updated version of Adobe Acrobat Reader.
These include permits needed for any construction work.
Download the form(s), complete and mail to the Village of Chenequa with proper payment.
There are 4 available permits:
1)
General Building and Remodeling
2) Plumbing
3) Electrical
4) Heating, Ventilating and Air Conditioning
Permit Fees
Permit cost the minimum plus 35%. All minimums are listed below.
When is a permit due for review?
The appropriate permit and fee(s) must be submitted by the 15th date of the month prior to the Plan Commission meeting. These items will be reviewed and additional information required must be received by the Monday, one (1) week prior to the meeting.
What work does not need a permit?
How do I get zoning information?
The building inspector's office hours are Monday, Tuesday, and Thursday from 3:00 to 4:00pm. You may come in to the Village Hall or call the inspector at (262)-367-2239.
You may also come to the Village Hall to review the Village map or purchase a laminated copy for $40.00.
Windows:
Iif the windows are identical in size and style to what is currently on the home, no a permit is not required. If you are changing or adding windows, yes a permit is required. Additionally, if the windows are changing in size or style, they need to be approved by the Plan Commission.
Decks:
Yes a permit is required, for zoning review. Additionally, the work will need to be approved by the Plan Commission. The cost is $50 minimum + .15¢ / square foot, + 35%.
Roofs:
Yes, a permit is required. The cost is $60 + 35%.
Fences:
Yes a permit is required. The fence must be 2 feet off the lot line and no higher than 8 feet. All fences need to be approved by the Plan Commission. Goose fence is allowed. Applications for Goose Fences are available here.
Failure to obtain a permit:
You will pay a double permit fee and if the project violates zoning codes and/or building codes, you will take the risk of having to make corrections to be in code
Building permits are good for 24 months.